Orisyvo

Ownership: Minera Fresnillo, S.A. de C.V. (100% Fresnillo plc)
Location: Chihuahua
Anticipated production: Avg. annual production of 136 koz gold
Indicated and inferred resources: 9.6 moz gold, 12.3 moz silver
Estimated Pre-operative Capex: US$350m

Overview and Key Exploration:

  • A test stope and a preliminary economic assessment study were completed; however, given Orisyvo would be a new district and thus require significant investment in infrastructure, development was deferred

  • Channel sampling and a revision of the resource models conducted at the Orisyvo gold deposits

  • Continued evaluation of the economic viability of this project

  • Currently expected to commence production in 2022